Estimate concrete for fence, deck, pergola and sign-post holes. Account for round or square post displacement, repeated holes, waste, bag yield and current supplier prices.

Post-hole formulas

Hole volume: π × (hole diameter ÷ 2)² × depth
Post displacement: post area × embedded depth
Net concrete: (hole volume − post displacement) × hole count

All measurements are converted to feet first. Choose no displacement when concrete is placed before a surface-mounted bracket or when you want a conservative gross-hole estimate.

Worked example

Ten 12-inch-diameter holes, 30 inches deep, containing 4-inch square posts require about 16.86 ft³ net. With 10% allowance, order about 18.54 ft³, or 31 bags yielding 0.6 ft³ each.

Visual guide

hole diameterdepth

Measure the excavated hole after digging. Soil collapse and bell-shaped bottoms can increase volume significantly.

Planning checklist

  • Verify property lines, utilities and permit requirements.
  • Check frost depth and minimum post embedment.
  • Use actual excavated dimensions, not auger labels alone.
  • Remove loose soil and standing water as required.
  • Brace posts plumb before concrete placement.
  • Confirm drainage, slope and top-of-footing finish.

For holes with enlarged bases, calculate the shaft and bell as separate cylinders, then add the volumes.

Frequently asked questions

Should I subtract the post volume?

Yes, when the post is embedded in the concrete. Select its shape and enter the actual cross-section.

How much extra concrete should I order?

Five to fifteen percent is common for clean formed work; irregular soil holes may need more.

Can I use metric dimensions?

Yes. Select centimeters or meters before entering all dimensions.

Does this determine safe footing size?

No. It estimates material only; a qualified designer must determine size and reinforcement.

Common mistakes

  • Using radius instead of diameter.
  • Ignoring post displacement.
  • Using planned rather than excavated dimensions.
  • Forgetting bell bottoms and over-excavation.